Coast residents will now have to wait until January to start using the Sh1.9 billion Likoni floating bridge. President Uhuru Kenyatta said on Thursday the bridge would be opened to the public from ...
The Likoni floating bridge, which connects Liwatoni in Mombasa island to Ras Bofu in Likoni South Coast mainland. [Omondi Onyango, Standard] Likoni ferry transport has witnessed heated politics for ...
The much-awaited Likoni floating bridge is 92 percent complete, says Transport CS James Macharia. Mr Macharia said the only remaining work on the Sh1.9 billion bridge is the assembling of the pontoons ...
• Most residents expressed their happiness over the bridge but lamented the lack of a shed. • Coast regional coordinator John Elungata urged residents to use the bridge responsibly.
• Mombasa Emergency Response Committee on Covid-19 has recommended 99 per cent of all ferry commuters to start using the footbridge. • Governor Hassan Joho says no one will be given preferential ...
It will take only seven minutes to cross the Likoni channel in Mombasa once the floating bridge is complete. This is the new reality awaiting residents once the 700 metres long Likoni Floating Bridge, ...
Offshore assembling of the Likoni floating bridge has begun after a ship with 70 steel tubular piles arrived in Mombasa over the weekend. Yesterday, a piling barge moved to the site where assembling ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果